Jake/Bull Mtn Mega Workparty Sept 27

Gush about your favorite trails and riding areas, gripe about the bad ones, find a new spot...

Jake/Bull Mtn Mega Workparty Sept 27

Postby robina » Fri Sep 05, 2014 9:58 am

If you love to ride at Jake and Bull Mtn, please come SORBA and CTHA on Sept 27th National Public Lands Day. Everyone is welcome (you don’t have to be a member of SORBA). Everyone works to their own ability.

We will be building 2 turnpikes on 223H – the Jake Mtn. trail, on the flat ground near Jones Creek. These turnpikes will replace the muddy areas. Back Country Horseman Dewey Campbell and USFS Taylor Hamilton will be using Dewey’s pack stock to haul the materials needed for the turnpikes. They’ll do this prior to the workday so that everything is already there on site for us.

If you would like to bring your bike or your horse to ride to the work site, that will be fine. We may have a bike cart or two to carry tools down. If you have your own bike cart and would consider bringing it to carry more tools down, that would be great – please let Debbie Crowe ([email protected]) know.

You’ll need a method to carry your lunch, enough water, and possibly a tool.

CTHA will provide lunch for those who RSVP. We’ll be having sack lunches this time since we’ll need to take them with us. So it’s important for you to please RSVP ([email protected]) – we want to make sure to have enough for everyone.

We still have 1 Singletracks.com membership to give away.

Thank you.

Stan Crane
NEGA SORBA President
[email protected]

Debbie Crowe
Chattahoochee Trail Horse Assoc
USFS Liaison
[email protected]
404-316-7956
User avatar
robina
SORBA
 
Posts: 2760
Joined: Sun Nov 30, 2003 8:00 pm
Location: Pinhoti, I hope.

Return to Trails & Trail Systems

Who is online

Users browsing this forum: No registered users

cron